Current Projects

Current Capital Improvement Projects (CIP) include adding or improving motorized and non-motorized transportation infrastructure, stormwater and sanitary sewer infrastructure, city facilities and other key projects.


BCT Wharf 3 Rehab

BCT Wharf 3 Rehab

This project consists of the design of the rehabilitation work to be performed on Wharf 3 to accommodate 100 gage ship to shore (STS) cranes.  The design consists of creating over 200 construction drawings and 200 technical specifications to upgrade Wharf 3, originally constructed in the 1980’s to support the larger STS cranes, and consequently providing service to post-Panamax ships.

Barbours Cut - Expansion of Gate Facilities

Barbours Cut - Expansion of Gate Facilities

This design objective is to increase the gate capacity to handle anticipated future growth at this terminal.

Barbours Cut Lash Dock Demolition

Barbours Cut Lash Dock Demolition

The project consists of the demolition of the Lash Dock located at the East End of Barbours Cut Terminal. The work includes the removal of all concrete structures such as decks and piles and dredging.

Barbours Cut Rehabilitation of Container Yard C1N and C2N

Barbours Cut Rehabilitation of Container Yard C1N and C2N

The scope of work includes the construction of approximately 20 acres of concrete pavement for storage of containers as well as traffic lanes to maintain circulation into and around storage areas.

Bayport Rail Spur Construction

Bayport Rail Spur Construction

Construction of approximately 6500 track feet of rail at the Bayport Terminal. This rail will cross State Highway (SH) 146 and connect the existing rail from Strang Rail line to within 900 feet of the Container Freight Station (CFS) Road in the Bayport Intermodal Facility.  This project will also include clearing, grubbing, drainage, rail crossings, signalization and perhaps a sound wall, if required.

Install Fender System at Wharfs No. 1 & 2 - CARE Terminal

Install Fender System at Wharfs No. 1 & 2 - CARE Terminal

Project will remove the existing fenders and install new fenders at Wharf 1 & 2 at the CARE Terminal.

Turning Basin - Demolition of Seafarers Building

Turning Basin - Demolition of Seafarers Building

This project will demolish the entire building structure, slab, pool, pool deck, parking lot to grade on the existing site.

@Port_Houston

Port Houston's Twitter avatar
Port Houston
@Port_Houston

Note: Port Houston container terminal truck gates will be closed on Monday, May 28th for #MemorialDay. See holiday… t.co/xo0urPtP1m

Port Houston's Twitter avatar
Port Houston
@Port_Houston

#BlogUpdate: SeaLand New Gulf Service Calls Port Houston. t.co/AzQH2INEpT

Port Houston's Twitter avatar
Port Houston
@Port_Houston

#PortHouOutreach: Port Houston believes in building strong #communities and introducing today’s students to potenti… t.co/mYhC2Pufsy

 

 

 

 

 

 

resources

 

Save