Current Projects

Current Capital Improvement Projects (CIP) include adding or improving motorized and non-motorized transportation infrastructure, stormwater and sanitary sewer infrastructure, city facilities and other key projects.


Turning Basin - Rehabilitation and Repair of Wharf 9

Turning Basin - Rehabilitation and Repair of Wharf 9

Structural concrete repair, fender replacement, and geotechnical rehabilitation.

Bayport - Construct Container Yard 7

Bayport - Construct Container Yard 7

Construction of approximately 50 acres of reinforced and roller compacted 18-inch concrete pavement, including the construction of a storm water collection system, water and sanitary sewer mains, high mast lighting and communication conduit.

Barbours Cut Reconstruction of Container Yard 3 North

Barbours Cut Reconstruction of Container Yard 3 North

The scope of work includes the construction of approximately 9 acres of concrete pavement (18ā€ roller compacted concrete). Also restriping traffic lanes and relocating high mast light poles

Bayport - Container Yard 2 South Security

Bayport - Container Yard 2 South Security

The project provides security cameras, fiber optic cables, UPS, and network switches to Container Yard 2 South.

Barbours Cut Fire Suppression System

Barbours Cut Fire Suppression System

This project consists of the construction of a freshwater fire suppression system for the terminal that will replace the exis
tin g saltwater system. The new system will utilize one of two existing freshwater tanks with a capacity of 500,000 gallons each and includes the rep air of existing tank, dry bore under roadway, and installation of new waterline, foundations, pumps, controllers, and emergency generator.

Bayport - Port Road Expansion and Drainage

Bayport - Port Road Expansion and Drainage

This project will add 1 additional lane to both the inbound and outbound lanes of existing Port Road. This project will also include installing new reinforced concrete boxes under Port Road and in existing Ditch ā€˜Dā€™ to drain 95.5 acre U shaped Port property.

Bayport - Construct Wharf 6, SSB #4 and Power

Bayport - Construct Wharf 6, SSB #4 and Power

Construct new wharf, stevedore building and electrical infrastructure at Bayport Terminal Wharf 6 (approximately 600 linear feet).